Permits, CofO, and Code
Back to Home.
Sources
Permit summary
Permit
Type
Status
Work description
Detail
01016-30000-05031
Bldg-Alter/Repair
Finaled 2002-01-23
Kitchen/bath remodel, closet reframing, front door replacement for #2
20019-30000-04078
Demo pre-inspection
Completed 2020-11-02
Pre-inspection for demolition of 2-story building
20019-30000-04077
Demolition
Application withdrawn 2025-04-18
Demolition of 2-story apartment building
21019-30000-00240
Demo pre-inspection
Completed 2021-02-25
Pre-inspection for demolish existing carport
18010-20000-02883
Bldg-New
Refund completed 2025-09-25; permit withdrawn
New 4-story 9-unit apartment with subterranean garage
19041-10000-43307
Electrical
Application withdrawn 2025-04-17
New 800A service / elevator scope for 9-unit project
18030-20000-04029
Grading
Detail/index show issued 2025-12-15
Grading for proposed 4-story 9-unit apartment; description also says withdrawn
18020-20000-01737
Shoring
Detail/index show issued 2026-06-12
Shoring for proposed 4-story 9-unit apartment; description also says withdrawn
19042-10001-27999
Plumbing revision
Application withdrawn 2025-04-17
Potable-water material / PRV/RP revision
19042-10000-28003
Plumbing
Application withdrawn 2025-04-17
Rainwater system and sump pump for 9-unit project
19042-10000-27999
Plumbing
Application withdrawn 2025-04-18
New plumbing system: potable water, waste & vent, sewage ejector
CofO
Source: CofO Detail #223733
Field
Value
CofO number
223733
Associated permit
18010-20000-02883
CofO status
Withdrawn
Interpretation: this CofO appears tied to the proposed 9-unit redevelopment, not necessarily the original 1958 8-unit building. Ask seller for existing building CofO/legal unit documentation.
Code enforcement
Source: CEIS Detail / CSR 602332
Field
Value
Date received
2025-03-25
Description
ABANDONED OR VACANT BUILDING LEFT OPEN TO THE PUBLIC
Status
NO VIOLATION
Retrofit
LADBS retrofit widget showed:
- Possible Soft-Story: NO
- Possible Non-Ductile Concrete Building: NO
Still get a structural/seismic inspection.
Interpretation
The prior 9-unit RTI/redevelopment story is not clean based on public LADBS data. The main new-building permit and CofO were withdrawn/refunded. Many associated MEP/demo applications were withdrawn. The shoring/grading permit status discrepancy must be resolved before relying on any development value.